Transport in Île-de-France: work scheduled for the weekend of February 24 and 25, 2024

Published by Graziella de Sortiraparis, Caroline de Sortiraparis · Photos by Caroline de Sortiraparis · Published on February 24th, 2024 at 03:59 p.m.
New works are scheduled for this weekend of February 24 and 25, 2024 on the Paris and Ile-de-France networks of the RATP and SNCF. We take a look at the disruptions expected on the metro, RER and Transilien networks this weekend.

A new weekend of work on the RATP and SNCF networks in the Île-de-France region is scheduled for Saturday February 17 and Sunday February 18, 2024, in order to make progress on the Grand Paris projects in particular. Once again, the work is expected to be extensive, leading to traffic disruptions and train cancellations. This weekend, two RER, four Transilien and three metro lines will be affected. If you need to get around, the Transilien SNCF website suggests alternative routes.

Here's the schedule for this weekend

RER C

Traffic is interrupted between Musée d'Orsay and Avenue Henri Martin, and between Musée d'Orsay and Javel.

RER E

Traffic is heavily reduced between Haussmann - Gare Saint-Lazare and Tournan and between Haussmann - Gare Saint-Lazare and Villiers-sur-Marne - Le Plessis-Trévise as well asbetween Paris and Chelles-Gournay / Vaires-Torcy.

Line J

Traffic is interrupted between Les Mureaux and Mantes-la-Jolie and between Issou Porcheville and Mantes-la-Jolie, as well as between Val de Reuil and Paris Saint-Lazare.

Line L

Traffic is interrupted between Saint-Cloud and Saint-Nom la Bretèche.

Line N

Traffic is interrupted in both directions between Paris Montparnasse and Versailles Chantiers as well as Rambouillet. Trains to and from Dreux are omnibus from Versailles Chantiers to Dreux in both directions. Mantes-la-Jolie services run only between Plaisir Grignon and Mantes-la-Jolie in both directions. Traffic is interrupted in both directions between Épône - Mézières and Mantes-la-Jolie.

Line P

Trains between Paris Est and Meaux, between Paris Est and Château-Thierry and between Paris Est and La Ferté-Milon are heavily reduced, as are trains between Paris Est, Coulommiers and Provins.

Line 4

On February 25 until 12 noon ,traffic is interrupted on the entire line due to roadworks.

Line 5

métro aérien ligne 5métro aérien ligne 5métro aérien ligne 5métro aérien ligne 5 Metro line 5: Gare d'Austerlitz station closed for 6 months
RATP has announced the closure of Gare d'Austerlitz station on metro line 5 for around 6 months, due to major refurbishment work. We tell you all about it. [Read more]

Line 14

From February 11 to 25, traffic is interrupted on the entire line due to works.

EN DIRECT : Le trafic et la circulation à Paris ce mardi 22 septembre 2020 en temps réel EN DIRECT : Le trafic et la circulation à Paris ce mardi 22 septembre 2020 en temps réel EN DIRECT : Le trafic et la circulation à Paris ce mardi 22 septembre 2020 en temps réel EN DIRECT : Le trafic et la circulation à Paris ce mardi 22 septembre 2020 en temps réel Info Metro RER trains, closures, works and demonstrations in Paris this Monday February 26th, 2024
In the blink of an eye, you'll have access to all the information you need about traffic in Paris, updated in real time. RATP Metro RER and Transilien, roadworks, traffic, major events and demonstrations, we give you all the practical information you need to know before going out in Paris this Monday February 26th, 2024. [Read more]

Practical information

Dates and Opening Time
From February 24th, 2024 to February 25th, 2024

×

    Official website
    www.transilien.com

    Comments
    Refine your search
    Refine your search
    Refine your search
    Refine your search