What time will the metro at République be running again on Tuesday morning? The station will not be served from 11 p.m. on Monday, October 26, 2026, on lines 3, 5, 8, 9 and 11, as a safety measure requested by the Paris Police Prefecture. For passengers who need to take the metro again on the morning of Tuesday, October 27, the RATP has not yet specified a reopening time.
The end of the 6 a.m. curfew does not confirm that service has resumed. Traffic is banned in the République area from 11 p.m. Monday to 6 a.m. Tuesday. Passengers wishing to catch a train or change lines at the station will also need to check the operator’s updates.
The service suspension announced for Monday evening affects the five metro lines that run through République:
No timetable for the resumption of service has been provided alongside these announcements. Before heading to République on Tuesday morning, check that your line is serving the station again. If your journey involves a transfer, also check the arrangements for changing trains there.
On line 8, there is an additional restriction to bear in mind: République is already closed for renovation work through April 22, 2027, inclusive. Lifting the safety measures will therefore not be enough to restore service at the station on this line.
A station accessible early in the morning may close later in the day. On Line 7, the RATP has announced that Sully–Morland will not be served on Tuesday, October 27, from 9:30 a.m. due to security measures.
No reopening time has been announced. If you need to reach the area after 9:30 a.m., plan to get off at another stop and check how long it will take to walk to your destination. This daytime closure is separate from the nighttime measure announced at République.
If you’re setting off early for Mitry–Claye or Paris–Charles-de-Gaulle Airport, check the first trains from your station. The RER B service bulletin announces weekday service interruptions for track work on the northern section of the line from 10:45 p.m. Monday to Friday through November 10 inclusive, with replacement buses.
This announcement of overnight engineering work does not, by itself, tell you when the first train for your journey will be available on Tuesday morning. Enter your destination and preferred time in the journey planner, especially if you need to catch a flight.
Closures for maintenance work follow their own schedule, independently of security measures:
The Saint-Michel station on Metro line 4 should not be confused with the Saint-Michel–Notre-Dame RER station. Check the stop’s name and the line you’re taking carefully when planning your connection.
Check the RATP traffic bulletin and Île-de-France Mobilités updates, then plan your journey by entering the date and time of travel. Check your departure station, each connection and your destination: trains may run on a line without stopping at every station.
If your departure depends on République reopening, check that service has resumed there or ask station staff. Plan to use another nearby stop if service has not been confirmed by the time you leave.
This page may contain AI-assisted elements, more information here.
Dates and Opening Time
From October 26, 2026 to October 27, 2026



















